Forest Diversion & Compliance Services

Forest Land Diversion

Expert consultation and end-to-end services for Forest Clearance (FC) under the FC Act, 1980, including surveys, documentation, and liaison with MoEFCC.

5+ Ongoing Projects
5+ Completed Projects

Project Information

Area Managed: 299+ Hectares
Compliance: FC Act & Wildlife Act
Process Time: Streamlined Service
Success Rate: 100%

Ready to Start?

Let's turn your vision into reality with our expert team and proven process.

Contact Us
Forest Diversion Project
Licensed & Insured

Forest Diversion & FC Act Compliance Services

ODRA Associates provides specialized services for Forest Clearance (FC) as mandated by the Forest (Conservation) Act, 1980, for non-forest use of forest land. We assist clients across various sectors (Mining, Infrastructure, Power) in achieving statutory compliance and obtaining approvals from the Ministry of Environment, Forest and Climate Change (MoEFCC).

Our expertise covers the entire process, including detailed DGPS/Total Station survey of the proposed forest land for diversion, identification and mapping of equivalent non-forest land for Compensatory Afforestation (CA), and the preparation of all required documentation for online submission on the Parivesh Portal.

We ensure accurate calculation of the Net Present Value (NPV), preparation of detailed Felling and Working Schemes, and seamless coordination with the Divisional Forest Officer (DFO), Principal Chief Conservator of Forests (PCCF), and the Central Government (MoEFCC) for Stage-I and Stage-II Clearances. Our successful track record includes liaising for linear projects, mining leases, and industrial projects across complex forest terrains.

Recent Forest Diversion Projects

Explore our portfolio of successfully completed and ongoing forest clearance applications

FC Case for Mining Lease (Category A)

Preparation of detailed revenue and forest boundary maps, DGPS survey of 100 Hectares for mining, and submission of Stage-I proposal to the MoEFCC, awaiting FRL clearance.

ODRA ASSOCIATES PRIVATE LIMITED

Transmission Line RoW Clearance

Handling the linear forest diversion case for a 132 KV power transmission line right-of-way (RoW) across reserved forest land, including detailed survey of tower locations and CA land identification.

ODRA ASSOCIATES PRIVATE LIMITED

Diversion for Industrial Water Pipeline

Detailed mapping and documentation for the diversion of a small patch of forest land for a critical industrial water pipeline, adhering to the minimum land requirement principle.

ODRA ASSOCIATES PRIVATE LIMITED

Linear Project Clearance (Road/Pipeline)

Preparation of cadastral plans, RoW demarcation, and land acquisition planning documents for a new section of the Coastal Highway Link Project, ensuring compliance with State Land Acquisition procedures.

ODRA ASSOCIATES PRIVATE LIMITED

11+

Ongoing Applications

(Across various stages of survey and documentation)

Our 6-Phase FC Act Compliance Methodology

1

Project Assessment & Pre-Feasibility Report

Review project layout against forest maps, initial determination of forest land area required for diversion, and preparation of minimum land requirement justification.

2

DGPS Survey & Area Demarcation

Accurate DGPS/Total Station survey of the proposed forest land for diversion, as well as the identification and survey of suitable non-forest land for Compensatory Afforestation (CA).

3

DPR & Revenue/Forest Land Documentation

Preparation of detailed drawings, L-sections, cross-sections, and comprehensive documentation including legal status of forest land, site inspection reports, and DGPS boundary pillars.

4

Online FC Portal Application (Stage-I)

Preparation and submission of the complete proposal on the MoEFCC Parivesh portal for Stage-I (in-principle) approval, including NPV and CA scheme calculations.

5

Field Inspection & State/Central Liaison (MoEFCC)

Coordination during mandatory site inspection by the State Forest Department and Regional Empowered Committee (REC), and responding to all queries for the proposal's review.

6

Stage-II Compliance & Final Approval

Ensuring compliance with all conditions stipulated in the Stage-I approval, including fund transfers (NPV/CA), and submitting the compliance report for final (Stage-II) clearance.